Brighton Beach - Works Completed
20th October 2006

Some shots of the completed service facility at Brighton Beach Station; supposedly built for the purposes of installing VICERS (vigilance) equipment to the Melbourne Electrified fleet.

The high grey towers allow access to the roof area of the train, whilst the two raised sidings allow simultaneous under-train access. The facility has enough room to work on two six-car trains at any one time.

Note that the platform 1 road is now out of service, and partly paved over - but this can be reversed at a future time with some quick removal of ashphalt and dismantling of the towers.

Shots feature a six car X'Trapolois train stabled in 3 road - one of the few times (if not the only time) that an X'Trap has run on the Sandringham line.


<-- Index | Showing 1-20 of 20 pictures | Index -->
Overview of completed works, with X'Trap!
Overview of completed works, with X'Trap!
 Buy Print
New driver safety paths
New driver safety paths
 Buy Print
X'Trap in the sidings
X'Trap in the sidings
 Buy Print
Another overview shot
Another overview shot
 Buy Print
An up Siemens passes by
An up Siemens passes by
 Buy Print
The Dwarf Signal remains
The Dwarf Signal remains
 Buy Print

 Buy Print
Overview of tracks 'up' of platforms. nothing much changed here except the new driver footpath
Overview of tracks 'up' of platforms. nothing much changed here except the new driver footpath
 Buy Print
you can JUST see the safety earthing wire still in place on the formaer #1 platform road (now out of service and partly built over)
you can JUST see the safety earthing wire still in place on the formaer #1 platform road (now out of service and partly built over)
 Buy Print
x'Trap bogie detail
x'Trap bogie detail
 Buy Print
X'trap coupler detail
X'trap coupler detail
 Buy Print
X'trap underframe detail
X'trap underframe detail
 Buy Print
x'Trap bogie detail
x'Trap bogie detail
 Buy Print
X'Trap front shot showing clearance under the train the raised service sidings has created
X'Trap front shot showing clearance under the train the raised service sidings has created
 Buy Print
X'Trap in the sidings showing the lower-than-normal overhead clearance
X'Trap in the sidings showing the lower-than-normal overhead clearance
 Buy Print
X'Tap fixed coupling
X'Tap fixed coupling
 Buy Print
X'Trap bogie (3)
X'Trap bogie (3)
 Buy Print

 Buy Print
Down Coming to the left, stabled X'trap to the right...
Down Coming to the left, stabled X'trap to the right...
 Buy Print

 Buy Print